Fort Lauderdale Public Works Administration Emergency Operations Center HVAC

SGM provided full demolition drawings for existing air cooled chillers, pumps, expansion tanks, and associated controls and a new air cooled chiller with variable primary chilled water pumping. We also provided associated controls, ET, AS as required with new CEP and new makeup water assembly and connect to existing domestic as required.

SGM also provided full demolition drawings for all HVAC systems including rooftop units, indoor AHUs, ductwork, VAV, diffusers, ect. All associated HVAC systems shall be removed. We provided new chilled water AHUs with VAV boxes with reheat and locating AHUs indoors as possible and consolidating/reducing the AHU count as possible to assist in maintenance.

All new HVAC controls were provided with this project and electrical panels were updated as required as well as associated conduit that has exceeded life expectancy. SGM provided new exhaust systems as required for general bathrooms and 3rd floor labs, as well as conditioned makeup air for 3rd floor. The entire building was currently backed up on emergency generator. Design shall ensured the building remained fully backed up on emergency generator.

We provided demolition drawings as required for the removal of all hydronic piping associated in the space and redundancy for future capacity identified on ground floor. As an option, we are exploring the possibility of locating AHUs on the ground floor in lieu of rooftop units currently installed. We also provided roofing details to accommodate re-roofing scope of existing rooftop units being removed.