SGM provided MEP services for Broward College Building 33 Chiller Plant. Scope included the installation of AHU’s, Chillers, Cooling Towers,
Daytona State College’s Advanced Technology College (ATC) is a 160,000 square foot facility with classrooms, laboratories, and multipurpose areas. The
SGM was responsible for the design and construction administration services to replace (1) existing 400-ton chillers and (2) existing 800-ton
SGM was responsible for designing and commissioning the Central Chiller Plant for the 2nd largest Convention Center in the Country,
SGM provided MEP/FP and Commissioning Services. The scope of work included the replacement of Water Cooled Chillers. New chilled water
SGM was the prime consultant and MEP/FP Engineer of Record responsible for site investigation, concept design, final design, and construction